UC Health Anschutz Cancer Pavilion

Aurora, CO

Tremco BUR Cold Applied – 30,500 Square Feet

Completed August 2022

Description: Full tear off of existing fully tapered gravel built roof system down the structural concrete deck. Replace with 2 layers of 2.6″ polyisocyanurate, 1/4″ per 12″ tapered insulation, and 1/2″ Dens Deck Prime all set in low rise foam. 2 layers of Composite Ply HT felt and 1 layer of Powerply HT granulated cap sheet all set in BIO adhesives. With Alphaguard BIO liquid flashings at all penetrations.

Challenge: Replace an aging roof system over a highly sensitive hospital environment where odors and VOC’s are completely unacceptable and with very little roof access from adjacent grounds.

LCI Solution: LCI worked closely with TREMCO Inc. and UC Health to design a roof system to release ZERO odors or VOCS into the surrounding campus ensuring the health and safety of patients and staff. Pre-planning and logistics meetings confirmed the need for rooftop loads and crane work to only be done on weekends. With all materials stored off site. The crew arrived at 4am to ensure tear off operations did not interfere with the sensitive operations in the building that started around 9 AM.

Warranty: 20 Year NDL Tremco Incorporated

Engie power plant before new roof coating was applied

Engie North America

Golden, CO

Tremco AlphaGuard Coating 37,000 Square Feet

Completed February 2021

Description: Mechanically abrade all metal surfaces. Pressure wash and prep roof to accept a fluid applied system. Encapsulate and coat previously waterproofed areas with Geoguard primer. Coat all bare concrete surfaces with AlphaGuard C-Prime Two-Component Epoxy Primer. Coat all bare metal surfaces with with AlphaGuard M-Prime. Install Permafab Polyester Fabric at all perimeter and vertical parapet wall/penetration transitions. Coat entire roof surface with AlphaGuard High Performance One Part Moisture Triggered Base Coat and AlphaGuard High Performance One Part Moisture Triggered Top Coat.

Challenge: Replace and aging roof system in a highly industrial environment that sees extreme wear, chemical exposure, and foot traffic on 16 different roof levels at various elevations in the complex.

LCI Solution: LCI worked closely with Tremco, Inc. and Engie North America to design a fluid applied roof system that could withstand the extreme abuse that an industrial power plant would create. While providing the flexibility needed to install on an operating plant.

Warranty: 15 Year Tremco QA

Side of new Gunnison Library

Gunnison County Library

Gunnison, CO

Complete Building Envelope

Completed August 2022

Description: 13,500 square feet Drexel metals 1.5″ mechanical standing seam, 2 layers of 3″ polyiso, 3/4″ CDX plywood, mechanically attached. MetShield high temp underlayment adhered with 702 primer. Metal Deck.

Warranty: 20 year Watertight NDL warranty. 

6000 Square Feet Carlisle 145 Mil RapidLock EPDM, 1/2 SecurShield RLHD cover board set in low rise foam. 2 layers of 3″ polyiso mechanically attached, 725 vapor barrier. Metal deck. 

Warranty: 20 year NDL warranty.

5900 Square Feet Imark Metals Alura metal panel rain-screen system on 16 gauge sub girts. 100% custom return, head, sill, and trim flashings. 2 different colors and profiles. All metal panel components were sourced from Canada and directly shipped to the job site.

1450LF Custom fabricated architectural metal column wraps and storefront return flashings.

Challenge: Design a system that could be installed during the brutal cold winter months of Gunnison, CO while keeping the project on a critical path

LCI Solution: LCI worked closely with Black Dragon Development, Drexel Metals, Carlisle Syntec Systems, and Imark metals to procure materials early in the height of the pandemic, designing systems that would be unaffected by freezing temperatures that reached -20F many times during the project. LCI Crews worked through the extreme cold to make it happen. We designed and fabricated over 250 different metal detail components to create a 100% seamless transition between exterior systems, resulting in a beautiful and aesthetically pleasing custom building envelope